Time Line Issues
The Time Line Generator (TLG) sequences all accelerator
operations.
Traditionally, each sequence (“module”) is independent,
including any necessary Booster prepulses.
This wasn’t really compatible with the goal of getting the
maximum possible beam out of the Booster.
In the new scheme:
Standalone sequences are placed in the time line, with necessary
prepulses
MiniBooNE pulses are “trailer-hitched” to the end of these to achieve a
specified average repetition rate, subject to an overall total rate.
If there aren’t enough modules to trailer-hitch to, new modules will be
built (still working the bugs out of this one).