Cables:
frequent replacement of HV cables and
|
|
|
connectors for ion pumps.
|
|
|
• |
Hoses: valve
actuator hoses have failed and are now
|
|
being replaced with stainless steel.
|
|
|
• |
Kicker magnets:
A kicker which recently failed
|
|
|
showed signs of radiation damage to the potting
|
|
|
rubber.
|
|
|
• |
Main magnet insulation: No main magnets have
|
|
|
failed in 30 years, but…
|
|
|
• |
Installed radiation “dose tabs” around the ring in
|
|
|
January shutdown to get a real estimate of dosage.
|
|