|
|
|
|
|
|
|
|
|
|
|
|
• |
In order to Reduce radiation, a “notch” is made in
the beam
|
|
|
|
early in the booster cycle.
|
|
|
• |
Currently, the extraction time is based on the
counted number
|
|
|
of revolutions (RF buckets) of the Booster. This
ensures that
|
|
|
|
the notch is in the right place.
|
|
|
• |
The actual time can vary by > 5 usec!
|
|
|
• |
This is not a problem if booster sets the timing, but it’s
|
|
|
|
incompatible with multi-batch running (e.g.
Slipstacking or
|
|
|
|
NuMI)
|
|
|
• |
We must be able to fix this total time so we can
synchronize to
|
|
|
the M.I. orbit.
|
|
|
• |
This is called “beam cogging”.
|
|