Multibatch Timing
In order to Reduce radiation, a “notch” is made in the beam
early in the booster cycle.
Currently, the extraction time is based on the counted number
of revolutions (RF buckets) of the Booster. This ensures that
the notch is in the right place.
The actual time can vary by > 5 usec!
This is not a problem if booster sets the timing, but it’s
incompatible with multi-batch running (e.g. Slipstacking or
NuMI)
We must be able to fix this total time so we can synchronize to
the M.I. orbit.
This is called “beam cogging”.