Multibatch Timing
•In order to Reduce radiation, a “notch” is made in the beam early in the booster cycle. •Currently, the extraction time is based on the counted number of revolutions (RF buckets) of the Booster. This ensures that the notch is in the right place.
•The actual time can vary by > 5 usec!
•This is not a problem if booster sets the timing, but it’s incompatible with multi-batch running (e.g. Slipstacking or NuMI) •We must be able to fix this total time so we can synchronize to the M.I. orbit.
•This is called “beam cogging”.