Injection Dogleg (ORBUMP)
•The current injection bump dogleg (ORBUMP) magnets can ramp at 7.5 Hz, with a substantial temperature rise.
•Need to go to 10 to support MiniBooNE and NuMI.
•2 spares for the 4 (identical) magnets. Most likely failure mode probably repairable.
•Considering new design which will stretch existing magnets further apart, which will lower their current, but will require a pulsed injection septum between the first two.
•Can new design incorporate injection improvements??
•Some power supply issues as well:
–One full set of replacement SCR’s for the switch network.
–New switchbox being designed, but needs attention (or order more spare SCR’s).
–No spare for charge recovery choke.