|
|
|
|
|
|
|
|
• |
New cooling has been installed in the accumulator
and
|
|
|
is being tested.
Initial results look good.
|
|
|
• |
Studies continue to understand all the transfer
|
|
|
|
efficiencies of the machines.
|
|
|
• |
Continue to improve helix and aperture in Tevatron
to
|
|
|
|
reduce long range beam interaction.
|
|
|
• |
Integrate recycler into accelerator operation some
time
|
|
|
in 2003.
|
|