The Plan
New cooling has been installed in the accumulator and
is being tested.  Initial results look good.
Studies continue to understand all the transfer
efficiencies of the machines.
Continue to improve helix and aperture in Tevatron to
reduce long range beam interaction.
Integrate recycler into accelerator operation some time
in 2003.