The Plan
•New cooling has been installed in the accumulator and is being tested.  Initial results look good. •Studies continue to understand all the transfer efficiencies of the machines. •Continue to improve helix and aperture in Tevatron to reduce long range beam interaction. •Integrate recycler into accelerator operation some time in 2003.