Main Injector
• The Main Injector can accept 8 GeV protons OR antiprotons from
• Booster
• The anti-proton accumulator
• The Recycler (which shares the same tunnel)
• It can accelerate protons to 120 GeV (in a minimum of 1.4 s) and deliver them to
• The antiproton production target.
• (soon) The fixed target area.
• (soon) The NUMI beamline.
• It can accelerate protons OR antiprotons to 150 GeV and inject them into the Tevatron.
• The Main Injector can also accept 150 GeV antiprotons from the Tevatron and decelerate them to 8 GeV for transfer to the Recycler.
• The Main Injector is exactly 7 times the circumference of the Booster.  Allowing one empty “slot” for switching, it can hold six booster batches, in the absence of exotic stacking schemes (slip stacking, RF barrier).
• It’s envisioned that one batch will be used for stacking and the rest for NUMI and/or switchyard 120.
•