|
|
|
|
|
|
|
|
|
|
|
|
• |
“stacking” (last 2 years): Proton source provides
|
|
|
protons to Main Injector, where they are accelerated
|
|
|
to 120 GeV for antiproton production – typically
7E15
|
|
p/hr max.
|
|
|
• |
MiniBooNE (last 2 months): 8 GeV protons delivered
|
|
|
directly to neutrino production target – typically
|
|
|
1.5E16 p/hr max, but baseline is 7 times that!!!
|
|
|
• |
NUMI (2004?): protons delivered to Main Injector,
|
|
|
which will accelerate them to 120 GeV for neutrino
|
|
|
production – wants at least 5E16 p/hr while
|
|
|
MiniBooNE and stacking are running.
|
|