•“stacking” (last 2 years): Proton source provides protons to Main
Injector, where they are accelerated to 120 GeV for
antiproton production – typically 7E15 p/hr
max.
•MiniBooNE (last 2 months): 8 GeV protons delivered directly to neutrino production target – typically 1.5E16 p/hr max, but baseline is 7 times that!!!
•NUMI (2004?): protons delivered to Main Injector, which will accelerate them to 120 GeV for neutrino production – wants at least 5E16 p/hr while MiniBooNE and stacking are running.