Reasonable
booster assumptions:
|
|
|
|
– |
5E12
ppp
|
|
|
|
– |
Ave
7.5 Hz rep rate
|
|
|
|
– |
Up to
1E17 pph w/o tripping rad alarm (BooNE needs)
|
|
|
• |
Assuming BooNE runs as planned, the one NuMI-
|
|
|
specific booster issue is that of beam cogging!
|
|
|
• |
With
those limits, NuMI can expect 2.7E20 p/year
|
|
|
• |
Slipstacking (if it worked perfectly!) would
increase
|
|
this by about 30%.
|
|
|
• |
Increasing the ppp could increase NuMI’s delivered
|
|
|
protons.
|
|