|
|
|
|
|
|
|
|
|
|
|
• |
In
order to Reduce radiation, a “notch” is made in the
|
|
beam
early in the booster cycle.
|
|
|
• |
Currently,
the extraction time is based on the counted
|
|
number
of revolutions (RF buckets) of the Booster.
|
|
|
This
ensures that the notch is in the right place.
|
|
|
• |
The
actual time can vary by > 5 usec!
|
|
|
• |
This
is not a problem if booster sets the timing, but
|
|
|
it’s
incompatible with multi-bunch running.
|
|
|
• |
We
must be able to fix this total time so we can
|
|
|
synchronize
to the M.I. orbit.
|
|
|
• |
This
is called “beam cogging”.
|
|