Ramped Closed Orbit Corrections
•The main beam elements ramp with the momentum, but up until now, the corrector elements have been operated DC
ŽBeam can “wander” by up to a few cm’s during ramp.
•Ramping control cards were installed during the shutdown.
•Closure control program almost ready. Still needs to be tested.
•Correctors not powerful enough to steer the beam all the way through the cycle.  Still, should help.