The Basics
•One of two electrostatic pre-accs accelerates H- ions to 750 keV.
•The linac accelerates these ions to 400 MeV
•The ions are injected over several (up to 12) turns into the booster, and passed through a foil to strip off the electrons.
•The booster accelerates the protons from 400 MeV to 8 GeV.
•The booster lattice is in an offset 15 Hz (line/4) resonant circuit.  This sets an overall quantum of time for the whole accelerator (“tick”, “click”, “clink”).
•Instantaneous 15 Hz rep rate routinely achieved.
•Average rep rate limited by
–Power dissipation of ramped elements
–Above ground radiation (safety issues)
–Below ground radiation (activation issues)
•Some numbers:
–Historical high*: 3E12 ppp @2.5 Hz (3E16 pph)
–Run II needs: 5E12 ppp @.7 Hz (1.3E16 pph)
–BooNE+Run II: 5E12 ppp @5.7 Hz (1E17 pph)
–NuMI + Run II: 5E12 ppp @3.2 Hz (6E16 pph)
*MR fixed target, back when life was cheap
Factor 8!